Environmental Control Facility, Shaler Hall, Fisher Museum electrical schedules and details 1971
- HF-ID: HFM1971-47
- Category: Maps
- Creator: Cleverdon, Varney and Pike
- Date: July 19, 1971
- Location: Harvard Forest
- Media: Paper
- Contents:
- plan, project no. 70152, drawing no. E-5. 1. 24"x36". unlisted.
- Abstract:
- shown: supervisory relay wiring for locally switched ltg. and supervisory relay wiring for contractor controlled ltg. also shown: schedule of lighting fixtures, lighting contractors, supervisory relays, power panel cpp, power panel sep, power panel mdp2, power panel mdpi, power panel edp, and power panel cep
- Related Items:
- Archives Location: Map Room, stack 5, drawer 17
- Access: Active