Harvard Forest Campus Biomass Central Plant: Schematic Design - Electrical Floor Plan and Proposed Electrical Oneline
- HF-ID: HFM2010-15
- Category: Maps
- Creator: Vanzelm Engineers, C.J. Lawler and Associates, Green International Affiliates, Inc.
- Date: September 17, 2010-September 22, 2010
- Location: Harvard Forest
- Media: Paper
- Contents:
- map. 1. 1/4"=1'0".
- Abstract:
- proposed new electrical one line
- Archives Location: Map Room, stack 5, drawer 19
- Access: Active